|
1
|
2024
|
Review Disain Struktur Atas Gedung Record Center
Akreditasi :
Penulis : B Basirun
Jurnal : Structure 6 (2), 40-49, 2024
Abstract : ...
|
0
|
|
2
|
2022
|
The Homeschooling Head Performance: How The Role Of Transformational Leadership, Motivation, And Self-efficacy?
Akreditasi :
Penulis : S Haq, M Asbari, D Novitasari, S Abadiyah
Jurnal : International Journal of Social and Management Studies 3 (1), 167-179, 2022
Abstract : ...
|
47
|
|
3
|
2022
|
Analisis Balok Perangkai (coupling Beams) Pada Apartemen 15 Lantai Di Timika Papua
Akreditasi :
Penulis : JM Guci, B Basirun, P Wistipin
Jurnal : Structure 4 (2), 54-73, 2022
Abstract : ...
|
0
|
|
4
|
2022
|
Analisa Optimalisasi Waktu Terhadap Time Schedule Dengan Menggunakan Cpm (critical Path Method) Pada Masa Pandemi Covid-19
Akreditasi :
Penulis : RA Safitri, B Basirun, Y Apriliana
Jurnal : Structure 4 (1), 32-42, 2022
Abstract : ...
|
1
|
|
5
|
2021
|
Studi Perbedaan Temperatur Beton Massa Pada Pekerjaan Raft Foundation Dengan Ketebalan 2, 5 Meter
Akreditasi :
Penulis : S Abadiyah, B Basirun, JHN Hafidz
Jurnal : Structure 3 (1), 89-95, 2021
Abstract : ...
|
1
|
|
6
|
2021
|
Analisa Pengaruh Penggunaan Superplastizer Terhadap Penggunaan Air Dan Kuat Tekan Beton Mutu Fc 25 Mpa
Akreditasi :
Penulis : B Alfandi, B Basirun, AM Rizki
Jurnal : Structure 3 (2), 158-161, 2021
Abstract : ...
|
0
|
|
7
|
2020
|
Perencanaan Struktur Bawah Dengan Kombinasi Pondasi Rakit Dengan Pile Cap Menggunakan Pondasi Tiang Bored Pile Pada Gedung Umk 10 Lantai Wilayah Klaten
Akreditasi :
Penulis : J Murdiaman, B Basirun, GA Pangestu
Jurnal : Structure 2 (2), 39-48, 2020
Abstract : ...
|
0
|
|
8
|
2020
|
Analisis Pengaruh Penambahan Abu Sekam Padi Terhadap Kuat Tekan Beton Portland Composite Cement (pcc)
Akreditasi :
Penulis : J Murdiaman, B Basirun, A Farianti
Jurnal : Structure 2 (1), 1-7, 2020
Abstract : ...
|
0
|
|
9
|
2020
|
Earned Value Analysis Terhadap Biaya Dan Waktu Pada Proyek Transpark Bintaro Di Pt. Adhi Persada Gedung
Akreditasi :
Penulis : B Basirun, MA Rosyid, N Apriliani
Jurnal : Structure 2 (1), 15-20, 2020
Abstract : ...
|
0
|
|
10
|
2019
|
Perbandingan Bekisting Sistem Scaffolding Dengan Bekisting Sistem Peri Up Untuk Pekerjaan Balok Dan Pelat Di Tinjau Dari Segi Biaya Dan Waktu Pelaksanaan Pada Mpp Project …
Akreditasi :
Penulis : S Purwanto, B Basirun, S Suyatno
Jurnal : Structure 1 (2), 31-38, 2019
Abstract : ...
|
4
|
|
11
|
2019
|
Analisis Stabilitas Dinding Penahan Tanah Apartment Tower C Transpark
Akreditasi :
Penulis : J Murdiaman, B Basirun, AR Salim
Jurnal : Structure 1 (1), 18-23, 2019
Abstract : ...
|
0
|